What permits does your project need?
Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.
Permit and plan check required
ADU — detached new construction
Standalone ADU built from scratch in the yard. Most flexible, longest timeline.
Trades typically involved
- Electrical — new circuits, outlets, fixtures
- Plumbing — fixtures, water lines, drains
- Mechanical / HVAC — heating, cooling, vents
Departments involved
Issues all construction permits, runs plan check, and performs inspections through final.
- · Building Permit
- · Plumbing Permit
- · Electrical Permit
- · Mechanical / HVAC Permit
Verifies zoning compliance, setbacks, height limits, and lot coverage under state ADU law.
- · Zoning Clearance
Reviews sewer capacity and collects sewer connection fee for the new dwelling.
- · Sewer Capacity Availability Request
- · Sewerage Facilities Charge (SFC)
Issues encroachment permits if new driveway, curb cut, or sidewalk work touches the right-of-way.
- · Driveway / Curb Cut Permit (B-Permit if applicable)
Required ADU covenant recording and rental registration.
- · ADU Covenant Recording
- · Rental Registration (if rented)
Reviews fire access, sprinklers (if main house has them), and hillside defensible space.
- · Fire Department Plan Review (hillside / sprinkler triggers)
Forms you’ll file
- · Building Permit Application
- · Plumbing Permit Application
- · Electrical Permit Application
- · Mechanical / HVAC Permit Application
What to expect
- · State law requires ministerial permit processing — no neighbor input, no discretionary review.
- · Building department has 60 days to approve a complete ADU application.
- · ADU permit fees protected by state code.
- · Setbacks reduced to 4 feet by state law for new ADUs.
- · No replacement parking required even if displacing existing parking.
Common pitfalls
- · Hillside lots may require grading review and soils reports.
- · Sewer connection capacity sometimes requires upgrade.
- · Fire sprinklers required if main house has them.
- · Existing 100A electrical service may not support an additional dwelling.
- · Title 24 energy compliance can require unexpected envelope upgrades.
- · Drainage and stormwater management often missed during design.
Open the calculator pre-filled for this project.
Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.