What permits does your project need?
Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.
Permit and plan check required
ADU — garage conversion
Converting an existing garage into an ADU. Faster and cheaper because the structure already exists.
Permit
Building Permit
Typical timeline
60–120
business days
Trades typically involved
- Electrical — new circuits, outlets, fixtures
- Plumbing — fixtures, water lines, drains
- Mechanical / HVAC — heating, cooling, vents
Departments involved
LADBSLos Angeles Department of Building and Safety
Issues all permits for the conversion as an alteration (faster than new construction).
- · Building Permit (Alteration)
- · Plumbing Permit
- · Electrical Permit
- · Mechanical / HVAC Permit
City PlanningLos Angeles Department of City Planning
Verifies that the existing garage location complies with zoning (almost always grandfathered).
- · Zoning Clearance
BOSBureau of Sanitation
Reviews sewer capacity and collects SFC for the new dwelling.
- · Sewer Capacity Availability Request
- · Sewerage Facilities Charge (SFC)
LAHDLos Angeles Housing Department
Required ADU covenant recording.
- · ADU Covenant Recording
- · Rental Registration (if rented)
Forms you’ll file
- · Building Permit Application
- · Plumbing Permit Application
- · Electrical Permit Application
- · Mechanical / HVAC Permit Application
What to expect
- · Filed as alteration rather than new construction — typically faster.
- · Insulation, ventilation, and energy code compliance required.
- · New parking is NOT required to replace converted garage (state law).
- · Garage door opening typically replaced with a wall and window assembly.
- · Floor-to-ceiling height minimums often the binding constraint.
Common pitfalls
- · Slab may not meet code for habitable space — cracks and moisture issues common.
- · Existing roof structure may need reinforcement.
- · Electrical service may need upgrade.
- · Existing slab elevation often below current minimum finish floor — leveling required.
- · Existing slab may lack vapor barrier required for habitable space.
Want the fee estimate?
Open the calculator pre-filled for this project.
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.