What permits does your project need?

Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.

Permit required

Electrical panel upgrade

Upgrading from 100A to 200A service, or replacing main panel.

Permit
Electrical Permit
Typical timeline
7–30
business days

Trades typically involved

  • Electrical — new circuits, outlets, fixtures

Departments involved

LADBSLos Angeles Department of Building and Safety

Issues the electrical permit and performs rough and final inspection. Releases the green tag to the serving utility for re-energization.

  • · Electrical Permit

Forms you’ll file

  • · Electrical Permit Application

What to expect

  • · Utility coordination required for service release and re-energization.
  • · AFCI/GFCI requirements apply to newly-served circuits.
  • · Whole-home grounding upgrade often triggered.

Common pitfalls

  • · Older grounding methods may not meet current code.
  • · Service entrance conductor may need replacement if undersized.
  • · Meter socket replacement may be required if existing is rated below new service.
Want the fee estimate?

Open the calculator pre-filled for this project.

Estimate the fee
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.

Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.