What permits does your project need?

Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.

Permit required

EV charger installation

Level 2 240V EV charging station installation.

Permit
Electrical Permit
Typical timeline
5–21
business days

Trades typically involved

  • Electrical — new circuits, outlets, fixtures

Departments involved

LADBSLos Angeles Department of Building and Safety

Issues the EV electrical permit and inspects the new 240V circuit and disconnect.

  • · Electrical Permit (EV)

Forms you’ll file

  • · Electrical Permit Application

What to expect

  • · New 240V circuit (typically 40-50A) required.
  • · Most installations don't require panel upgrade.
  • · GFCI protection required at exterior installations.

Common pitfalls

  • · Older 100A panels often at capacity — load calculation required.
  • · Long conduit runs add significant labor cost.
  • · Outdoor installations need NEMA 4-rated equipment.
Want the fee estimate?

Open the calculator pre-filled for this project.

Estimate the fee
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.

Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.