What permits does your project need?
Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.
Express permit
Fence or block wall
New fence or masonry wall along property line.
Permit
Express Building Permit (Fence/Wall)
Typical timeline
3–21
business days
Departments involved
LADBSLos Angeles Department of Building and Safety
Issues the fence/wall permit and inspects footing, reinforcement (for masonry), and final.
- · Express Building Permit (Fence/Wall)
City PlanningLos Angeles Department of City Planning
Verifies front-yard height limits, corner-lot sight-distance rules, and setbacks.
- · Zoning Clearance
Forms you’ll file
- · Building Permit Application (Fence/Wall, Express pathway)
What to expect
- · Fences under 6 feet generally don't require permit.
- · Block walls over 3.5 feet always require permit.
- · Front yard height limits often more restrictive (typically 3-4 feet max).
- · Property line surveys required if location is disputed.
Common pitfalls
- · Property line confusion — get a survey before building.
- · Hillside lot retaining-wall function requires engineered design.
- · Sight-distance requirements at corner lots often missed.
Want the fee estimate?
Open the calculator pre-filled for this project.
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.