What permits does your project need?

Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.

Express permit

Fence or block wall

New fence or masonry wall along property line.

Permit
Express Building Permit (Fence/Wall)
Typical timeline
3–21
business days

Departments involved

LADBSLos Angeles Department of Building and Safety

Issues the fence/wall permit and inspects footing, reinforcement (for masonry), and final.

  • · Express Building Permit (Fence/Wall)
City PlanningLos Angeles Department of City Planning

Verifies front-yard height limits, corner-lot sight-distance rules, and setbacks.

  • · Zoning Clearance

Forms you’ll file

  • · Building Permit Application (Fence/Wall, Express pathway)

What to expect

  • · Fences under 6 feet generally don't require permit.
  • · Block walls over 3.5 feet always require permit.
  • · Front yard height limits often more restrictive (typically 3-4 feet max).
  • · Property line surveys required if location is disputed.

Common pitfalls

  • · Property line confusion — get a survey before building.
  • · Hillside lot retaining-wall function requires engineered design.
  • · Sight-distance requirements at corner lots often missed.
Want the fee estimate?

Open the calculator pre-filled for this project.

Estimate the fee
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.

Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.