What permits does your project need?
Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.
Permit and plan check required
Kitchen remodel
Replacing cabinets, counters, fixtures, and appliances. Range from cosmetic to full structural.
Permit
Building Permit
Typical timeline
21–60
business days
Trades typically involved
- Electrical — new circuits, outlets, fixtures
- Plumbing — fixtures, water lines, drains
- Mechanical / HVAC — heating, cooling, vents
Departments involved
LADBSLos Angeles Department of Building and Safety
Issues the combined Building/Plumbing/Electrical/Mechanical permits and runs plan check and inspections.
- · Building Permit
- · Plumbing Permit
- · Electrical Permit
- · Mechanical / HVAC Permit
Forms you’ll file
- · Building Permit Application
- · Plumbing Permit Application
- · Electrical Permit Application
- · Mechanical / HVAC Permit Application
What to expect
- · Cosmetic kitchen remodel (cabinets, counters, fixtures, no walls): lighter pathway, simplified plan check.
- · Removing or moving any wall triggers structural review and full plan check.
- · New 240V circuits required for electric ranges and wall ovens.
- · Range hood ducted to exterior required (no recirculating-only).
Common pitfalls
- · Moving the kitchen sink usually requires re-routing the drain line — expensive and triggers plan check.
- · Removing a load-bearing wall requires structural engineering and adds $1,500–$5,000 before construction.
- · Older electrical panels may need an upgrade to support new dedicated circuits.
- · Title 24 energy compliance required when adding lighting circuits or kitchen equipment.
- · Tempered glass required at windows within 24 inches of the kitchen sink.