What permits does your project need?
Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.
Permit and plan check required
Solar panel installation
Rooftop solar PV system with inverter and (optional) battery storage.
Permit
Electrical Permit
Typical timeline
14–45
business days
Trades typically involved
- Electrical — new circuits, outlets, fixtures
Departments involved
LADBSLos Angeles Department of Building and Safety
Reviews structural attachment, rapid shutdown compliance, and electrical interconnection point.
- · Building Permit (Solar)
- · Electrical Permit (Solar)
LAFDLos Angeles Fire Department
Reviews fire setbacks on the roof plane and access pathways.
- · Solar Fire Setback Review
Forms you’ll file
- · Building Permit Application
- · Electrical Permit Application
- · Solar PV Plan Set
What to expect
- · Most jurisdictions have streamlined solar permit pathways.
- · Roof structural review required.
- · Utility interconnection is a separate process from the building permit.
- · Battery storage requires additional Energy Storage System permit components.
Common pitfalls
- · Older roofs may need replacement before solar — avoid two penetrations.
- · Battery storage adds significant electrical permit complexity.
- · Rapid Shutdown compliance required for newer systems.
Want the fee estimate?
Open the calculator pre-filled for this project.
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.