What permits does your project need?

Pick your project and see the permits required, the departments involved, the forms to file, and a realistic timeline. Free, no signup.

Express permit

Window or door replacement

Replacing existing windows or exterior doors.

Permit
Express Building Permit
Typical timeline
1–14
business days

Departments involved

LADBSLos Angeles Department of Building and Safety

Issues the express building permit and inspects flashing, NFRC labels, and tempered glass locations.

  • · Express Building Permit (Windows/Doors)

Forms you’ll file

  • · Building Permit Application (Express pathway)

What to expect

  • · Same-size, same-type replacement: Express Permit.
  • · Resizing openings: structural review required.
  • · Title 24 fenestration U-factor and SHGC requirements apply.
  • · NFRC labels must remain on windows until inspection.

Common pitfalls

  • · Egress requirements may not be met by direct replacement.
  • · Tempered glass required at specific locations (within 24" of doors, near stairs, in wet areas).
  • · Replacement windows in older openings may require structural header replacement.
Want the fee estimate?

Open the calculator pre-filled for this project.

Estimate the fee
Already did this work without a permit?
You can usually still legalize it with a retroactive permit. See how to fix unpermitted work.

Informational only. Requirements are set by LADBS and can vary with your exact scope. Confirm before starting work.